A correct start-up is a precondition for subsequent flawless operation
Start-up must be carried out in accordance with the instructions provided by Landia along with the product(s).
The following should always be checked in connection with the start-up:
that the unit has been installed correctly in accordance with our instructions (check torque levels, the unit’s position in relation to the bottom and horizontal angle, the tension of the lifting gear wire etc. where relevant)
That the electrical connection has been set up correctly (have thermal sensors and any sealing monitoring systems been connected?)
That the unit has the correct direction of rotation
Landia can make an employee available to assist with the start-up and optimisation of operations and instruction in everyday service and maintenance by agreement.